About the project

DBS was selected to manufacture, supply and install over 300 metres of high security chainmesh fencing with cranked posts and 3 rows of barb wire including various security access gates.

To protect the high value assets at this site, our team ensured quality checks were carried out at every stage of the manufacturing and installation process. This project required our crews to be prepared to work in harsh and unforgiving conditions while maintaining the highest standards of install.

DBS Fencing are proud to have delivered an outstanding fencing package for a critical piece of infrastructure in Western Australia.

Materials and scope

  • Location: New Norcia, Western Australia
  • Over 300 metres of high security chainmesh fencing
  • Cranked posts with 3 rows of barb wire
  • Various security access gates
  • Manufactured, supplied and installed by DBS

Project gallery

More projects

Wire fencing around pumps and pipework at the Golden Grove mine site processing area, installed by DBS Fencing

Golden Grove Minesite Operations

Perimeter, compound and fauna fencing packages for 29 Metals at their Golden Grove mine site.
Palisade security fencing along a rail underpass, installed by DBS Fencing

Thornlie-Cockburn Link

800m of non-conductive palisade fencing with anti-dig plinths, plus 3km of chainmesh fencing and handrail along the rail corridor.
Aerial view of a black chainmesh compound beside a school oval, installed by DBS Fencing

Ray Owen Reserve

Sports ground fencing and an AFL goal net for the Ray Owen Reserve upgrade in Lesmurdie.
1967

Get in touch

Planning a fencing project?

Tell us about your site and we will come back with a clear quote.

Scroll to Top